Enter the TNB bills for the previous (3) three months.
Average Monthly Bill
RM
Bill After PasangSolar
RM
Required kWp
kWp
Simple Payback Period
Years
Estimated PasangSolar Upfront Cost
RM
Bill Before Tax
RM
Estimated Monthly kWh Usage
kWh
kWh to Offset (90% Savings)
kWh
Get a custom quote in less than five minutes.
TAIACE ENGINEERING SDN BHD
TAIACE ENERGY SERVICES SDN BHD
No. 43A, Jalan Permata 1,
Arab Malaysian Industrial Park,
71800 Nilai, Negeri Sembilan,
MALAYSIA.
Copyright © 2025 PasangSolar powered by Taiace