*The calculation is based on Commercial Tariff B. 0-200kW first = RM0.435 Above 200kW = RM0.509
The NEM GoMEn initiative facilitates the use of energy generated by solar PV systems on government properties, such as mosques, educational institutions, medical facilities, and NGOs.
| Solar Capacity | Current Bill | Bill After PasangSolar | |
|---|---|---|---|
| Direct Purchase | SARE Scheme | ||
| 30 kWp | RM 3,000 | RM 1,530 | RM 2,790 (7% Savings) |
| 60 kWp | RM 5,000 | RM 2,070 | RM 4,600 (8% Savings) |
| 90 kWp | RM 8,000 | RM 3,600 | RM 7,280 (9% Savings) |
| 120 kWp | RM 10,000 | RM 5,860 | RM 9,000 (10% Savings) |
*The calculation is based on Commercial Tariff B. 0-200kW first = RM0.435 Above 200kW = RM0.509
*The total savings are estimates based on the experiences of other users. The values may vary depending on building conditions, sun angle, current electricity tariffs, etc.
Get a custom quote in less than five minutes.
TAIACE ENGINEERING SDN BHD
TAIACE ENERGY SERVICES SDN BHD
No. 43A, Jalan Permata 1,
Arab Malaysian Industrial Park,
71800 Nilai, Negeri Sembilan,
MALAYSIA.
Copyright © 2025 PasangSolar powered by Taiace